TOKYO MARUI UZI’S
Nothing else needs to be said aside from both are mine & will be converted in some way.
Watch this space.
I’ve taken on a pile of jobs, a new list will go up soon. As always, assume 6-12 weeks turnaround. My new sad loser room is well under way!
I need the gas tube/heatsheild from an LR-300. G&G, A&K, doesn’t matter – money waiting.
I’ve done two paint jobs today, one is drying & this little monster is finished! Fucking Tasty!
I’m having a day off, I normally work 7/7 but I’m fucking shattered. I’ll probably make a video… Post office needs to happen, but aside from that. And courier… But…
On the cheap because it was snapped… But can I make it awesome?
Nah bruv, that’s not scratches from all of the sand in my gun… That’s rifling…